Page MenuHomePhabricator

Obtain metal to repair Lower Shed (delete once included in site design)
Open, HighPublic

Description

Measure the S-section top wall-to-roof edges / runners, and determine replacements.

Order new metal so we can replace these parts with new ones.

Event Timeline

Timotheos triaged this task as High priority.Jun 20 2022, 21:13
Timotheos created this task.
Timotheos created this object with visibility "Public (No Login Required)".
Timotheos created this object with edit policy "Trusted Contributors (Project)".
Timotheos updated the task description. (Show Details)Jun 21 2022, 19:25
Elle moved this task from To-do list to Backlog on the Trusted Contributors board.Dec 2 2022, 20:45
Elle moved this task from Backlog to Site Design & Planning on the Trusted Contributors board.
Elle assigned this task to Timotheos.Dec 2 2022, 20:54
BradCini renamed this task from Obtain metal to repair Lower Shed to Obtain metal to repair Lower Shed (delete once included in site design).Dec 25 2022, 07:29