this seems obsolete @Timotheos
- Queries
- All Stories
- Search
- Advanced Search
- Transactions
- Transaction Logs
Advanced Search
Apr 12 2023
Dec 2 2022
Jun 7 2022
Agreed, although a third one might be useful for @Lara's hut, I guess we could deal with that when it happens.
May 4 2022
Considering how long the first one is lasting we'll probably only need to swap between the two. You can probably scrap this job if you want to de-clutter @Timotheos
@Timotheos - I am perfectly happy with the way the IBCs are at the moment and just very lightly chlorinating them occasionally instead. If in future other people want to regularly use those IBCs, we'll end up having to pump water from the creek - which is fine but whether they're covered or not will need be treated anyway. Additionally, the water is perfectly fine for washing and bathing and it's not difficult to bring drinking water in. Thoughts?
May 1 2022
Done @Timotheos
Feb 12 2022
This will be done by the end of the weekend. I am also putting an outlet pipe on the original which may alleviate the condensation issue somewhat.
Oct 28 2021
Oct 19 2021
Oct 8 2021
Sep 20 2021
Great idea! I'm keen for that :)
Great work! Sorry, I guess you've seen these now, but I had created T152: Create wheelie bin composting toilet for Tiny Village #2 and T153: Create wheelie bin composting toilet for Tiny Village #3 already :)
Sep 18 2021
I was considering just cutting some timber to size and laying it over the top as they would make a good standing outdoor bar. I will fashion some 'rings' to place over the intakes to filter debris from the downpipes.
First one down and two to go. I shall create a new task for these. I'm hoping to get about 4 months out of each on rotation.
Sep 17 2021
Aug 30 2021
Robert Packer has come out and repaired the dam wall on Monday 23rd August 2021.
Aug 9 2021
Aug 1 2021
Jul 28 2021
Jul 20 2021
This was completed during T109: Create Lily Pad using earthworks.
Jan 26 2021
Jan 25 2021
Enquiry sent. Pending dam rupture incident, this will be moved to consideration at a later date.
Jan 19 2021
Jan 15 2021
This was done with a small and narrow pipe, so it will be upsized in T82: Upsize drainage pipe for Tiny Village dam road :)
Jan 13 2021
Jan 12 2021
We used the donated composting toilet from Ian and connected power to it, then welded up a quick shelter frame and screwed recycled corrugate steel as walls.