Drainage pit about .5m deep filled with river stones. The run off from the sink and toilet go here. The toilet pipe goes under the gravel and should disperse into the ground fine - there is barely any run off anyway (a few drips here and there) and shouldn't be any smell. Some native grasses planted around the outside of the pit would help.
- Queries
- All Stories
- Search
- Advanced Search
- Transactions
- Transaction Logs
Advanced Search
Sep 18 2021
First one down and two to go. I shall create a new task for these. I'm hoping to get about 4 months out of each on rotation.
Sep 17 2021
I have reopened this task because the previous set-up was a bit ad-hoc and has become overgrown. It was suitable for the event at the time, but a more permanent and professional solution is now desired :)
Aug 30 2021
Robert Packer has come out and repaired the dam wall on Monday 23rd August 2021.
Aug 9 2021
Aug 8 2021
Note the Friend Tent sign was sufficiently destroyed by the weather that it was not put up again. It will be fixed in T74: Finish initial Tiny Village signage.
This was kindly done by Adam before the event :)
Extension cables are running from the Cottage to the lower shed (at least, the metal twin boxes, for now, which is very close).
Aug 6 2021
Aug 5 2021
Aug 1 2021
Jul 28 2021
Jul 23 2021
This has been completed. The green sink from the upper shed was used. The duct tape solution for the sink drainage is a bit flaky but seems to be working well enough!
This has been completed tonight, it looks really lovely :)
Jul 22 2021
We have set up the frame and will bring the door down tomorrow :)